WW2MMDB_LOGO
Login Register
World War II Multimedia Database Photos wwii1173
Advanced Search
Print on SnapGalaxy.com RSS Feed for this Photo Send as eCard View Slideshow View Slideshow (Fullscreen)

World War II Multimedia Database Photos

1. wwii1420 ... 427. wwii1170 428. wwii1171 429. wwii1172 430. wwii1173 431. wwii1174 432. wwii1175 433. wwii1176 ... 691. wwii2241

Random Image

wwii0197

wwii0197

Views: 980

wwii1173

Fat Man F31 After Assembly

Date: 06/11/2007
Size:
Full size: 2898x1912
nextlast
first previous
wwii1173

Photo Properties

summary  details
IPTC: Caption FM unit being placed on trailer cradle in front of Assembly Building #2. Project Alberta was formally established within the Manhattan Project in March 1945, although its functions had been performed by various Project offices for months. Its purpose was to undertake the steps necessary to deploy the bomb into the combat zone, and to ensure that it was ready for delivery at the earliest possible moment. Approximately 55 scientists, engineers and military personnel worked in conjunction with the 509th Composite Group. That meant training bomb assembly teams and technical support personnel, providing logistic arrangements for the 509th's special weapons, and assembling and testing weapons and practice devices at Tinian. The "Fat Man" team that assembled and loaded the bomb included Charles P. Baker (Pit Team Co-Head), Vincent Caleca, Morton Camac, Lieutenant John D. Hopper, Henry Linschitz, Philip Morrison (Pit Team Co-Head), Roger S. Warner Jr., (Assembly Team Chief). Raemer S. Schreiber arrived on July 26, 1945 with a plutonium core and initiator on board C-54 "Green Hornet." On August 2, three B-29s arrived at Tinian from Kirtland Air Force Base, New Mexico each carrying a Fat Man-type high-explosive preassembly. "Fat Man" (number F31) with high explosives and a nuclear (plutonium) core was assembled by US Navy Lieutenant Commander Frederick L. Ashworth. In the rush to complete the bomb, the firing unit cable was installed backwards, requiring Ensign Bernard J. O'Keefe to cut the connectors and reinstall them at the very last minute. F31 was assembled on August 7 and loaded into B-29 "Bock's Car" at 2200 Hours on August 8. IPTC: Copyright Notice Caption ©2007 MFA Productions LLC Image in the Public Domain
IPTC: City North Field IPTC: Country Name Marianas
IPTC: Date Created 19450807 IPTC: Province State Tinian
Keywords: Nagasaki Assembly Building #2 Fat Man Tinian 509th Composite Group
nextlast
first previous
Powered by Gallery v2.3